A Target is the planned amount for a folder or budget for the fiscal year. Here's where to set it and how it compares against actuals.
What a Target is
A Target is the top-down planned amount assigned to a Folder or Budget β the "we're allocating this much" number. Targets live on the Rollup / Grand Total panel of the hierarchy and are the baseline that line-item plans and actuals are compared against in reporting.
Targets are distinct from the sum of underlying Line Item planned amounts. In practice, you want the two to agree: the Target is set top-down, and your team fills in Line Items that collectively reach that Target.
Setting a Target
- Open the Folder or Budget in the budget grid.
- Open the Rollup / Grand Total panel (via the Home page Panel column, or from inside the hierarchy).
- Find the Target row for the relevant period (annual, quarterly, or monthly, depending on configuration).
- Enter the Target amount.
- Save.
Target distribution across periods
Like Line Items, Targets can be distributed across time periods (monthly, quarterly). Default behavior is even distribution; override per-period cells to customize.
Reporting Target vs Actual
Reports in Insights compare Target to the sum of mapped Actuals (and optionally POs) to show variance. If a report is showing wildly off numbers:
- Confirm the Target is actually set (zero or null Targets will skew variance).
- Confirm the fiscal period on the report matches the period the Target was set for.
- Check that multi-currency filters are applied if your account uses multi-currency reporting. See Does Allocadia support multi-currency reporting?
Comments
Please sign in to leave a comment.